Case Studies
Tower upgrade
BWM was commissioned to review and advise on an upgrade to an existing cooling system to cater for the customer's intentions to double production capacity resulting in a significant increase in total required heat rejection.
BWM supplied and installed the necessary new components to not only provide the system with the required cooling all year round but also provided a level of headroom to allow for abnormal temperature conditions and minor increases in overall heat rejection.

